Recycled Water Facility
City of Redwood City
Project Type:
Designer:
Kennedy/Jenks Consultants
Contractor:
JMB Construction, Inc.
Construction Cost:
$18.0 million
This project constructed a new recycled water facility including modifications to the existing dual media filters, the installation of two 2.5 million gallon cast in place reinforced concrete storage tanks, two 0.5 million gallon chlorine contact tanks, and a distribution pump station. In addition, this project included the installation of large diameter piping between the new recycled water facility and the existing facility and the installation of the critical utilities necessary for operation of the new facility.
Key Project Features:
- Earned the WateReuse "Large Project of the Year" Award for 2007