Lakeview Pump Station

City of Redwood City
Project Type: 
Designer: 
City of Redwood City Engineers
Contractor: 
Casey Construction
Construction Cost: 
$550,000

This improvements project demolished an existing cast iron pipeline, controls building, pump cans. The existing pumps were removed and retrofitted to work with a new set of pump cans. Additionally, the project installed a new pump control house, ductile iron pipe, a back-up generator set, variable frequency drives, automatic transfer switch and signal/power wiring. This project will also required close coordination with the Contractor, PGE and Redwood City to perform the work while keeping power to the existing facility controls.