Ignacio Transfer Pump Station
Novato Sanitary District
Project Type:
Designer:
Winzler & Kelly, RMC Water and Environment
Contractor:
Maggiora & Ghilotti, Inc.
Construction Cost:
$6.5 million
Due to aging facilities and more stringent regulatory requirements, a pump station was constructed at the existing wastewater treatment plant. This work included building a concrete-lined equalization basin, various cast-in-place concrete structures, yard piping, valves, gates, pumps, a ventilation system and soil bed for odor control, a new CMU control building to house the electrical and instrumentation equipment, and associated site grading.