Bel Marin Keys Pump Station No. 5
Novato Sanitary District
Project Type:
Designer:
Winzler & Kelly
Contractor:
Bamer Construction Company
Construction Cost:
$1.1 million
This project utilized three submersible pumps with a capacity of 2.2 mgd. The station included a 22 ft. deep wet well structure, a valve vault and flow meter vault, and an emergency generator for back-up power supply. The new pump station replaced an existing pump station and was built on the constrained site while keeping the existing system in operation. Following completion of the new pump station the old station was decommissioned and demolished.






