Wastewater Treatment Plant Interim Upgrades

City of Hughson
Project Type: 
Designer: 
Carollo Engineers
Contractor: 
GSE Construction
Construction Cost: 
$1.9 million

This project provided interim upgrades and additional capacity to the existing wastewater treatment plant. The project consisted of two shotcrete lined ponds with two floating mixers and two floating aerators, an effluent pump station with four submersible pumps and the installation of various piping, electrical, and instrumental upgrades.