Euclid Road to Hatch Road Extension & Storm Drainage Relocation

City of Hughson
Project Type: 
Designer: 
Carollo Engineers
Contractor: 
GSE Construction
Construction Cost: 
$1.2 million

The project combined of two components. The first was the extension of Euclid Road, which consisted of installing a three barrel reinforced concrete box culvert siphon in the existing Turlock Irrigation District’s (TID) canal with reinforced concrete retaining walls to allow for the extension of Euclid Road, over the TID irrigation canal, to Hatch Road. The second consisted of relocating the storm drainage pump station. It included salvaging two existing pumps, an electrical cabinet, electrical appurtenances and the installation of a new sluice gate and discharge structure.