Eastern Dublin Zone 3 Potable Water Facilities
Dublin San Ramon Services District
Project Type:
Designer:
Black & Veatch
Contractor:
G.S.E.
Construction Cost:
$3.2 million
This project constructed a new 1.0 mgd pump station for pumping potable water to a 1.2 million gallon steel reservoir. The work included 1,600 feet of 14-inch C900 PVC pipeline, storm drain, fiber-optic conduit and roadway; as well as, permanent erosion control for a drainage gully adjacent to the reservoir. An additional 2700 feet of 14-inch ductile iron pipe installed by a developer from the pump station. This project is located in an environmentally sensitive area.