Surface Water Treatment Plant Facility

City of Brentwood
Project Type: 
Designer: 
RMC Water and Environment
Contractor: 
Tidelands Construction
Construction Cost: 
$7.0 million

This project constructed a new treated water pump station for the City of Brentwood at the Contra Costa Water District’s Randall Bold Water Treatment Plant. The pump station was built with a 12.0 mgd and a future capacity of 41.0 mgd. Approximately 3,500 linear feet of 42-inch pipe and 1,400 linear feet of 18-inch pipe segments were installed.