Surface Water Treatment Plant Facility
City of Brentwood
Project Type:
Designer:
RMC Water and Environment
Contractor:
Tidelands Construction
Construction Cost:
$7.0 million
This project constructed a new treated water pump station for the City of Brentwood at the Contra Costa Water District’s Randall Bold Water Treatment Plant. The pump station was built with a 12.0 mgd and a future capacity of 41.0 mgd. Approximately 3,500 linear feet of 42-inch pipe and 1,400 linear feet of 18-inch pipe segments were installed.